| Roper
Energy Systems
Project
location: 8824 Fallbrook, Houston, TX 77090
Architect and/or Engineer: LCS design-build
Type
of project and/or planned use:
Roper builds and tests analytical gas detection devices for
Gas Chromatograph type equipment.
LCS installed the stainless steel piping system (20,000 LF)
for multiple gases including H2, He, O2, Ar, IA, and Air,
and the installation of the laboratory casework, fume hoods
and exhaust.
Start
date: 11/21/05
Completion
date: 4/30/06
Size
: 100,000 sq ft build-out with 20,000 sq ft of laboratory
Project
details:
Existing tilt-wall building renovation, with laboratories,
mechanical room, bottle yard, warehouse and office space
Key company personnel on project:
Project Manager – Bob Daimler
Project Superintendent – Randy Robertson
Project Foreman – Glen Powdrell
Unique aspect of project: LCS designed the
test stands and table top brackets for this innovative distribution
of cylinder gases.
|