Location: Panorama City,
CA
Project
Description: The building
is a newly completed shell of approximately 13,000 SF plus
an existing second floor of 1,850 SF. The Second Floor
Expansion will add approximately 4,600 SF of space supported
on a structural steel frame on new footings plus metal decking
topped with light weight concrete. In addition, an
exterior balcony is added outside of the lounge. The Interior
Build-Out includes a complete Architectural, Mechanical,
Electrical and Plumbing build out with significant expansion
of the existing fire protection system and more than doubling
the main electrical power feed. Laboratory casework,
a cold room and other features including an architectural
featured wall will be included.
Architect
and/or Engineer:
The Architecture
Studio, Inc
Major subcontractors:
Champ Steel
A&F Electric
Pennington Construction – rough carpentry
Key LCS personnel:
Dave Carlos – Project Manager
Gary Douglas – Superintendent
Bryon Anderson – Plumbing
Chet Keating - Plumbing



|